Following is a question by the Hon Chan Chun-ying and a written reply by the Acting Secretary for Transport and Logistics, Mr Liu Chun-san, in the Legislative Council today (April 24):
Question:
It is learnt that a large number of public and transport facilities were damaged during the period of black-clad violence, and apart from restoring the damaged facilities, the Government has also retrofitted the facilities with protective devices in certain districts. Moreover, some members of the public have relayed to me that some of the damaged public and transport facilities have not yet been fully restored so far. In this connection, will the Government inform this Council:
(1) whether it has examined the status of the restoration of all the public and transport facilities damaged during the period of black-clad violence; if so, of the details, and set out in a table the latest status of the restoration of such facilities;
(2) whether it has reviewed the need to retrofit public and transport facilities with protective devices; if so, of the details; if not, the reasons for that; and
(3) whether it will, in the light of the extent of the damage caused to public and transport facilities during the period of black-clad violence, review the materials used in the construction of such facilities and consider using stronger and more durable materials in the future; if so, of the details; if not, the reasons for that?
Reply:
President,
In consultation with the Security Bureau, the Environment and Ecology Bureau and other relevant departments, my reply to the various parts of the question raised by the Hon Chan is as follows:
(1) The major public and transport facilities damaged during the black-clad violence have been restored with details as follows:
Facilities | Status of restoration |
Pedestrian pavement | About 22 000 square metres of paving blocks were removed and the relevant restoration work was completed. |
Railings | About 60 kilometres of railings were removed and the relevant restoration work was completed. |
Traffic lights | About 740 sets of damaged traffic lights and traffic signal controllers were all repaired and have fully resumed operation. |
Traffic bollards and traffic signs | About 2 700 traffic bollards and about 300 traffic signs were damaged (e.g. being removed or defaced, etc.) and the relevant restoration work was completed. |
Bus stops and facilities of public transport interchange | All the damaged bus stops and facilities of public transport interchange were repaired and have fully resumed operation (Note). |
MTR stations | All the damaged station facilities (including entry/exit gates, ticket issuing machines, lifts and escalators) (involving 85 heavy rail stations and 63 light rail stations) were repaired and have resumed service. |
Highway structures (including vehicular/pedestrian footbridges, pedestrian subways) | About 700 highway structures were damaged (e.g. with lighting damaged or being defaced, etc.) and the relevant restoration work was completed. |
Lifts/escalators | About 20 lifts/escalators were damaged (e.g. with glass panels damaged or being defaced, etc.) and the relevant restoration work was completed. |
Lamp posts | About 1 500 lamp posts and about 100 control cubicles were damaged and the relevant restoration work was completed. |
Litter bins and recycling bins | About 1 320 litter bins and about 130 recycling bins were damaged and all facilities were subsequently replaced. |
Note: Franchised bus operators and the Transport Department do not have record of the specific number of bus stops and facilities of public transport interchange that were damaged during 2019.
(2) The Hong Kong Police Force (HKPF) and other relevant departments will from time to time review measures to retrofit protective devices on the facilities concerned in the light of the actual situation and in accordance with the principle of public safety.
For example, the Transport Department (TD) had installed protective devices for the traffic signal controllers and protective meshes for pedestrian traffic signal heads at some major road junctions. After co-ordination with the HKPF, as well as careful consideration and balancing of factors such as the installation and maintenance costs and the social conditions, the TD has ceased the installation and removed the protective devices installed earlier.
In addition, to meet the Government's need to enhance public safety, the Highways Department (HyD) has installed temporary fencing at about 60 vehicular/pedestrian footbridges to prevent the throwing of miscellaneous articles onto nearby roads, which may affect public travel. After co-ordination with the HKPF, and taking into account various factors, the HyD has removed the temporary fencing at six of these vehicular/pedestrian footbridges and will continue to review the need for the relevant measure.
(3) In view of the damage to major public and transport facilities, the relevant government departments have not only reviewed the materials of these facilities, but also further strengthened the facilities from the design aspect. Examples include:
Ends/Wednesday, April 24, 2024
Issued at HKT 12:00